• 171 Malleable Iron Pipe Clamp Double Sided Mesh Panel
  • 171 Malleable Iron Pipe Clamp Double Sided Mesh Panel
  • 171 Malleable Iron Pipe Clamp Double Sided Mesh Panel
  • 171 Malleable Iron Pipe Clamp Double Sided Mesh Panel
  • 171 Malleable Iron Pipe Clamp Double Sided Mesh Panel
  • 171 Malleable Iron Pipe Clamp Double Sided Mesh Panel

171 Malleable Iron Pipe Clamp Double Sided Mesh Panel

Garantie: 30-50 ans pour h.d.g
Application: Décorations
Certification: CE, ISO
Traitement de surface: Oui
Technique: Forgé
Matériel: Acier

Contacter le Fournisseur

Membre Diamant Depuis 2012

Fournisseurs avec des licences commerciales vérifiées

Fabricant/Usine, Société Commerciale

Info de Base.

N° de Modèle.
G171
Type
collier de serrage
surface
galvanisé à chaud (hdg)
résistance à la traction
>= 350 mpa
dureté
hb<=150
matériau de la vis
acier inoxydable
allongement
>= 10 %
Paquet de Transport
Box and Pallets
Spécifications
G171
Marque Déposée
HM & OEM
Origine
Chine
Code SH
730890
Capacité de Production
50000 Sets Per Month

Description de Produit

171 Malleable Iron Pipe Clamp Double Sided Mesh Panel

PRODUCT DESCRIPTION
1. HULK Metal pipe clamp fittings are designed by using malleable iron in accordance with ASTM A197 which applies for good mechanical strength and enough elongation characters. The surface treatment of the kee clamp is hot dipped galvanized which meet the specification of ASTM A153 to anti-rusting and corrosion.
171 Malleable Iron Pipe Clamp Double Sided Mesh Panel
2. Six different sizes are available as following.
171 Malleable Iron Pipe Clamp Double Sided Mesh Panel

3. Three kinds of standard surface treatment can be provided on key clamp, suitable for all kinds of indoor and outdoor application.

171 Malleable Iron Pipe Clamp Double Sided Mesh Panel

4. All our pipe joint connectors are with TUV, CE and ISO certificate.171 Malleable Iron Pipe Clamp Double Sided Mesh Panel
PRODUCT PARAMETERS
Modular structures eliminate design and engineering costs, on-site fabrication issues while reducing installation costs.
HULK Metal pipe fittings can be adapted or extended with additional components, or to be adjusted on-site.
171 Malleable Iron Pipe Clamp Double Sided Mesh Panel
INSTALLATION INSTRUCTIONS
Designed for easy use, our key clamps are created for the modern construction environment. It combines the benefits of strength and durability without the need of specialized tradesmen, hot work permits, fire spotters and welding protection to finished surfaces.
171 Malleable Iron Pipe Clamp Double Sided Mesh Panel
WHO IS HULK Metal
Over 16 years, HULK Metal has been a trusted name in piping solutions by offering high-quality products, service and support to the PVF industry continuously.
We provide expertise and product solutions for a wide range of applications, plumbing, mechanical, industrial, air-conditioning and refrigeration, mining, oil, gas, fire protection, equipment and power system.
We organize the whole production process in accordance with ISO 9001 and ISO 14001. It has also the most complete certificates in the PVF industry, including UL/FM/ of US, CRN/cUL of Canada, DVGW/TUV/CE/VdS of Germany, BSI/LPCB of UK, SII of Israel, JIS of Japan, ABNT of Brazil, GOST-R of Russia, CNBOP of Poland, KS of South Korea, TSE of Turkey, PSB of Singapore, SIRIM of Malaysia, SABS of South Africa etc.
171 Malleable Iron Pipe Clamp Double Sided Mesh Panel

PACKING AND SHIPPING
Cartons and then plywood pallets are used into key clamp packages, suitable for sea or air export business which can be stacked in containers.
171 Malleable Iron Pipe Clamp Double Sided Mesh Panel
FAQ
Q1. How can I get your prices of kee clamp?
A: Please provide your detail inquiry list which including items, surface requirement and  estimated order quantity. Then detail quotation will be provided.
Q2. Can I have a sample before business start?
A: Yes, we welcome sample order to test and check our quality. Usually samples are free and you just need to pay the courier cost by FedEx or DHL.
Q3. What's about the lead time of order?
A: Sample order usually need 5-7 days after order confirmation. Mass production order usually need 30-40 days after prepayment received.

 

Envoyez votre demande directement à ce fournisseur

*De:
*A:
*Message:

Entrez entre 20 à 4000 caractères.

Ce n'est pas ce que vous recherchez? Publier la Demande d'Achat Maintenant

Trouver des Produits Similaires par Catégorie

Page d'Accueil du Fournisseur Produits Raccords de tuyauterie structurelle 171 Malleable Iron Pipe Clamp Double Sided Mesh Panel