Liste de Produits

(Total 462 Produits)
Prix FOB: 60,00 $US / Pièce
Commande Min.: 5 Pièces
  • Processus de fabrication: Electroplating or Sintering
  • Forme: Customized Production According to Drawing
  • Agent Bonding: Metal or Resin
  • Production Cycle: 35 Days After Drawing Confirmed
  • Tolerance-1: 2um
  • Tolerance-2: 0.5 Degree
Prix FOB: 60,00 $US / Pièce
Commande Min.: 5 Pièces
  • Processus de fabrication: Electroplating or Sintering
  • Forme: Customized Production According to Drawing
  • Agent Bonding: Metal or Resin
  • Production Cycle: 35 Days After Drawing Confirmed
  • Tolerance-1: 2um
  • Tolerance-2: 0.5 Degree
Prix FOB: 60,00 $US / Pièce
Commande Min.: 5 Pièces
  • Processus de fabrication: Electroplating or Sintering
  • Forme: Customized Production According to Drawing
  • Agent Bonding: Metal or Resin
  • Production Cycle: 35 Days After Drawing Confirmed
  • Tolerance-1: 2um
  • Tolerance-2: 0.5 Degree
Prix FOB: 60,00 $US / Pièce
Commande Min.: 5 Pièces
  • Processus de fabrication: Electroplating or Sintering
  • Forme: Customized Production According to Drawing
  • Agent Bonding: Metal or Resin
  • Production Cycle: 35 Days After Drawing Confirmed
  • Tolerance-1: 2um
  • Tolerance-2: 0.5 Degree
Prix FOB: 60,00 $US / Pièce
Commande Min.: 5 Pièces
  • Processus de fabrication: Electroplating or Sintering
  • Forme: Customized Production According to Drawing
  • Agent Bonding: Metal or Resin
  • Production Cycle: 35 Days After Drawing Confirmed
  • Tolerance-1: 2um
  • Tolerance-2: 0.5 Degree
Prix FOB: 60,00 $US / Pièce
Commande Min.: 5 Pièces
  • Processus de fabrication: Electroplating or Sintering
  • Forme: Customized Production According to Drawing
  • Agent Bonding: Metal or Resin
  • Production Cycle: 35 Days After Drawing Confirmed
  • Tolerance-1: 2um
  • Tolerance-2: 0.5 Degree
Prix FOB: 60,00 $US / Pièce
Commande Min.: 5 Pièces
  • Processus de fabrication: Electroplating or Sintering
  • Forme: Customized Production According to Drawing
  • Agent Bonding: Metal or Resin
  • Production Cycle: 35 Days After Drawing Confirmed
  • Tolerance-1: 2um
  • Tolerance-2: 0.5 Degree
Prix FOB: 60,00 $US / Pièce
Commande Min.: 5 Pièces
  • Processus de fabrication: Electroplating or Sintering
  • Forme: Customized Production According to Drawing
  • Agent Bonding: Metal or Resin
  • Production Cycle: 35 Days After Drawing Confirmed
  • Tolerance-1: 2um
  • Tolerance-2: 0.5 Degree
Prix FOB: 60,00 $US / Pièce
Commande Min.: 5 Pièces
  • Processus de fabrication: Electroplating or Sintering
  • Forme: Customized Production According to Drawing
  • Agent Bonding: Metal or Resin
  • Production Cycle: 35 Days After Drawing Confirmed
  • Tolerance-1: 2um
  • Tolerance-2: 0.5 Degree
Prix FOB: 60,00 $US / Pièce
Commande Min.: 5 Pièces
  • Processus de fabrication: Electroplating or Sintering
  • Forme: Customized Production According to Drawing
  • Agent Bonding: Metal or Resin
  • Production Cycle: 35 Days After Drawing Confirmed
  • Tolerance-1: 2um
  • Tolerance-2: 0.5 Degree
Commande Min.: 1 Pièce
  • Processus de fabrication: Electroplating or Sintering
  • Forme: Customized Production According to Drawing
  • Agent Bonding: Metal or Resin
  • Production Cycle: 35 Days After Drawing Confirmed
  • Tolerance-1: 2um
  • Tolerance-2: 0.5 Degree
Prix FOB: 60,00 $US / Pièce
Commande Min.: 5 Pièces
  • Processus de fabrication: Electroplating or Sintering
  • Forme: Customized Production According to Drawing
  • Agent Bonding: Metal or Resin
  • Production Cycle: 35 Days After Drawing Confirmed
  • Tolerance-1: 2um
  • Tolerance-2: 0.5 Degree
Commande Min.: 1 Pièce
  • Processus de fabrication: Electroplating or Sintering
  • Forme: Customized Production According to Drawing
  • Agent Bonding: Metal or Resin
  • Production Cycle: 35 Days After Drawing Confirmed
  • Tolerance-1: 2um
  • Tolerance-2: 0.5 Degree
Commande Min.: 1 Pièce
  • Processus de fabrication: Electroplating or Sintering
  • Forme: Customized Production According to Drawing
  • Agent Bonding: Metal or Resin
  • Production Cycle: 35 Days After Drawing Confirmed
  • Tolerance-1: 2um
  • Tolerance-2: 0.5 Degree
Commande Min.: 1 Pièce
  • Processus de fabrication: Electroplating or Sintering
  • Forme: Customized Production According to Drawing
  • Agent Bonding: Metal or Resin
  • Production Cycle: 35 Days After Drawing Confirmed
  • Tolerance-1: 2um
  • Tolerance-2: 0.5 Degree
Commande Min.: 1 Pièce
  • Processus de fabrication: Electroplating or Sintering
  • Forme: Customized Production According to Drawing
  • Agent Bonding: Metal or Resin
  • Production Cycle: 35 Days After Drawing Confirmed
  • Tolerance-1: 2um
  • Tolerance-2: 0.5 Degree
Commande Min.: 1 Pièce
  • Processus de fabrication: Electroplating or Sintering
  • Forme: Customized Production According to Drawing
  • Agent Bonding: Metal or Resin
  • Production Cycle: 35 Days After Drawing Confirmed
  • Tolerance-1: 2um
  • Tolerance-2: 0.5 Degree
Commande Min.: 1 Pièce
  • Processus de fabrication: Electroplating or Sintering
  • Forme: Customized Production According to Drawing
  • Agent Bonding: Metal or Resin
  • Production Cycle: 35 Days After Drawing Confirmed
  • Tolerance-1: 2um
  • Tolerance-2: 0.5 Degree
Commande Min.: 1 Pièce
  • Processus de fabrication: Electroplating or Sintering
  • Forme: Customized Production According to Drawing
  • Agent Bonding: Metal or Resin
  • Production Cycle: 35 Days After Drawing Confirmed
  • Tolerance-1: 2um
  • Tolerance-2: 0.5 Degree
Commande Min.: 1 Pièce
  • Processus de fabrication: Electroplating or Sintering
  • Forme: Customized Production According to Drawing
  • Agent Bonding: Metal or Resin
  • Production Cycle: 35 Days After Drawing Confirmed
  • Tolerance-1: 2um
  • Tolerance-2: 0.5 Degree
Commande Min.: 1 Pièce
  • Processus de fabrication: Electroplating or Sintering
  • Forme: Customized Production According to Drawing
  • Agent Bonding: Metal or Resin
  • Production Cycle: 35 Days After Drawing Confirmed
  • Tolerance-1: 2um
  • Tolerance-2: 0.5 Degree
Commande Min.: 1 Pièce
  • Processus de fabrication: Electroplating or Sintering
  • Forme: Customized Production According to Drawing
  • Agent Bonding: Metal or Resin
  • Production Cycle: 35 Days After Drawing Confirmed
  • Tolerance-1: 2um
  • Tolerance-2: 0.5 Degree
Commande Min.: 1 Pièce
  • Processus de fabrication: Electroplating or Sintering
  • Forme: Customized Production According to Drawing
  • Agent Bonding: Metal or Resin
  • Production Cycle: 35 Days After Drawing Confirmed
  • Tolerance-1: 2um
  • Tolerance-2: 0.5 Degree
Commande Min.: 1 Pièce
  • Processus de fabrication: Electroplating or Sintering
  • Forme: Customized Production According to Drawing
  • Agent Bonding: Metal or Resin
  • Production Cycle: 35 Days After Drawing Confirmed
  • Tolerance-1: 2um
  • Tolerance-2: 0.5 Degree

Dernière Date de Connexion: May 20, 2024

Type d'Entreprise: Société Commerciale

Produits Principaux: Diamond Grinding Wheel, Diamond Tool, Diamond Dresser, Diamond Roller, Abrasive, Grinding Wheel, Diamond Abrasive, Diamond Grinding Wheels, Diamond Tools, Grinding Wheels